亚洲av成人片无码网站,无码av无码天堂资源网,少妇人妻陈艳和黑人教练,亚洲av第一页国产精品,4455永久免费视频

 

No. 5 tower of special facilities line of Meulaboh project successfully installed


2022-09-06 14:57

米拉務(wù)鐵塔.jpg

On May 28, the last steel structure of tower 5 of Meulabho special facilities project line was hoisted in place, marking the safe and smooth installation of the highest line tower of Meulaboh project.

A total of 5 line towers are designed for the special facilities of Meulaboh project. The tower 5 installed this time is an important junction tower connecting the special facilities and the power grid, and undertakes the important task of sending out two 275kv high-voltage lines. The tower is 84.6 meters high and the total weight of the steel structure is more than 70 tons. The tower is installed in sections by using the construction method of pole pulling and tower assembling.?

The completion of the construction of No. 5 tower has laid a solid foundation for the electrification of the next special facility substation and the realization of the in plant reverse power transmission node on schedule.?

回到頂部圖片

Copyright(C)www.china-cdto.com All Rights Reserved
Address: Floor 12, No. 1 Caishikou Street, Xicheng District, Beijing,China
PostCode:100052 Email: info@china-cdto.com

Produced By CMS 網(wǎng)站群內(nèi)容管理系統(tǒng) publishdate:2025-04-24 17:03:19